50+
Years Manufacturing
24h
Typical Quote Response
12c
Colour Gravure
FOB
Xiamen & Quanzhou
How We Work

From Quote to Shipment — a Simple Process.

Designed to reduce back-and-forth and help you get accurate quotes faster.

01

Share Your Requirements

Format, size, quantity, material preference, and packing method (HFFS/VFFS/manual). The more detail, the faster the quote.

02

Artwork & Spec Confirmation

We verify dielines, print areas and production-ready files. Accepted formats: AI, PDF, EPS, PS, and high-resolution JPG/JPEG.

03

Sampling (Optional)

Approve material feel, colour and functionality before mass production. 3–7 working days unprinted, 7–15 days printed. Free up to 20 pcs.

04

Production & Delivery

Mass production with QC checks and shipment coordination. FOB Xiamen, FOB Quanzhou or EXW basis. 10–25 working days after cylinder confirmed.

Certifications & Compliance

Quality You Can Verify.

ISO 9001:2015 and ISO 14001:2015 certified, issued by EACC. Every production lot ships with COA and supporting compliance documentation.

9001

ISO 9001:2015 Quality Management

CERT NO · 11426Q03089R101 · ISSUED BY EACC

Certified scope: design and printing of PE and PP plastic packaging bags, issued by Beijing East Allreach Certification Center Co., Ltd. (EACC). Certificate copies available on request.

14001

ISO 14001:2015 Environmental Management

CERT NO · 11425E411083R0M · VALID TO 4 NOV 2028

Same certified scope as ISO 9001, also issued by EACC and accredited by CNAS under the IAF Multilateral Recognition Arrangement. Valid to 4 Nov 2028.